Durres pumping station

Wastewater lifting station in Durres where EDICO supplied and installed the electrical systems for the pumping station.

Durres pumping station

Project scope

For the wastewater pumping station in Durres, also known as the lifting station, EDICO supplied and installed the electrical systems for the pumping station.

The work covered the electrical installation, panel installation, cabling, control equipment, and preparation for commissioning on site.

Delivered by EDICO

  • Supply and installation of electrical systems.
  • Electrical panel installation and connection.
  • Cable routing and field wiring.
  • Integration of pumping station control equipment.
  • Testing support and commissioning preparation.
  • Remote monitoring setup for operational support.

Pumping station works

The project included the electrical infrastructure needed to operate the wastewater pumping station reliably.

Panels and field devices were installed, wired, checked, and prepared for startup so the station could operate with a clear control and monitoring base.

Project photos

Durres pumping station site
Durres pumping station site
Durres pumping station works
Durres pumping station works
Durres pumping station electrical installation
Durres pumping station electrical installation
Durres pumping station panel installation
Durres pumping station panel installation
Durres pumping station panel cabling
Durres pumping station panel cabling
Durres pumping station switchgear room
Durres pumping station switchgear room
Durres pumping station control room panels
Durres pumping station control room panels
Durres pumping station panel lineup
Durres pumping station panel lineup
Durres pumping station electrical room
Durres pumping station electrical room
Durres pumping station field panel
Durres pumping station field panel
Durres pumping station installed panels
Durres pumping station installed panels
Durres pumping station cabinet detail
Durres pumping station cabinet detail
Durres pumping station commissioning area
Durres pumping station commissioning area
Durres pumping station electrical works
Durres pumping station electrical works
Durres pumping station panels
Durres pumping station panels
Durres pumping station final installation
Durres pumping station final installation
Durres pumping station panel detail
Durres pumping station panel detail
Durres pumping station remote monitoring
Durres pumping station remote monitoring

Outcome

The pumping station received the electrical systems and control infrastructure needed for operation, commissioning, and ongoing monitoring.