2019-08-30
Durres pumping station
Wastewater lifting station in Durres where EDICO supplied and installed the electrical systems for the pumping station.

Project scope
For the wastewater pumping station in Durres, also known as the lifting station, EDICO supplied and installed the electrical systems for the pumping station.
The work covered the electrical installation, panel installation, cabling, control equipment, and preparation for commissioning on site.
Delivered by EDICO
- Supply and installation of electrical systems.
- Electrical panel installation and connection.
- Cable routing and field wiring.
- Integration of pumping station control equipment.
- Testing support and commissioning preparation.
- Remote monitoring setup for operational support.
Pumping station works
The project included the electrical infrastructure needed to operate the wastewater pumping station reliably.
Panels and field devices were installed, wired, checked, and prepared for startup so the station could operate with a clear control and monitoring base.
Project photos
Outcome
The pumping station received the electrical systems and control infrastructure needed for operation, commissioning, and ongoing monitoring.